Ribbons
SPC-2 adhesive for concrete plugs (3kg+950ml)
Technical data:
-
Adhesive layer: 2-10 minutes
-
Working time at 23°C: 60-80 minutes
-
Working temperature: 5°C - 40°C
-
Operating temperature: -30°C - 80°C
-
Waterproof and frost-resistant
-
Standard: EN 1504-3:2005
Sent to the email address provided in the order details
Shipping cost for the selected product
The shipping cost applies to this product (in the selected variant - if applicable). It may change after adding other products to the cart.
Shipping costs are not included in the price.
Shipping costs are not included in the price.
Share the product card
Description
SPC-2 adhesive for concrete plugs (3kg+950ml)
Glue for formwork plugs is a specialised two-component formulation, developed for the permanent fixing of plugs in formwork tie holes. It provides high adhesion and excellent tightness to ensure effective sealing of concrete structures. Ideal for use in demanding construction conditions.
Technical data:
-
Adhesive layer: 2-10 minutes
-
Working time at 23°C: 60-80 minutes
-
Working temperature: 5°C - 40°C
-
Operating temperature: -30°C - 80°C
-
Waterproof and frost-resistant
-
Standard: EN 1504-3:2005