Ceiling formwork 100m2 20-14kN

Availability: out of stock
Gross price: €8,420.89
incl. 23.00% TAX, excl. shipping costs

Regular price:

8420.89
The lowest price during 30 days prior to the reduction:
Net price: €6,846.25
excl. 23.00% TAX, excl. shipping costs

Regular price:

The lowest price during 30 days prior to the reduction:
quantity pcs
You gain 1,035 points [?]

product unavailable

Description

Ceiling formwork 100m2 20-14kN 2,00-3,60m

The formwork built with it is extremely durable. Moreover, it has high resistance to mechanical damage and weather conditions. The components of the system are protected in an appropriate way. The steel parts have been galvanized, the wooden parts have been covered with a special protective paint.

 

Set specifications: 

  • Metreage: 100m2

  • Triple-layer plate circumscribed E

  • Support 2.00m-3.60m 20-14kN

 

  • The construction tripod at the initial stage stabilizes and protects the support from tipping. The tripod does not transfer any forces that can affect the support.
  • The supports are built using the telescopic method. Special holes placed in the support every 10 cm provide protection against falling or crushing hands. Load capacity 20-14 kN.
  • The construction head consists of a mandrel, support plate and arms. It is a support for H20 formwork beams. It keeps them upright and prevents them from slipping.
  • The joist transfers loads to the main supports, providing permanent support. One of the main advantages of using joists is the use of fewer anchors.
  • The three-layer slab has a high bending tolerance. Its use guarantees a smooth concrete surface. It is also waterproof, so it can be used for both indoor and outdoor work.

 

The set includes: 

  • Galvanized support 2.00-3.60m 20-14kN - 100pcs.

  • Galvanized tripod - 30pcs.

  • Cross head - 50pcs.

  • Wooden girder forged - 300mb

  • Triple-layer board of E-wrapped - 100m2

up
Shop is in view mode
View full version of the site
Sklep internetowy Shoper Premium