Hoist Imer AP 150 for scaffolding
Standard equipment:
✓ Motor with magnetic braking system
✓ Rotating boom with locking working position
✓ Control panel with emergency stop button on 5m neoprene cable
✓ Safety device against over-winding of the cable
✓ IP 67 16A connector
✓ Scaffolding terminals
Shipping costs are not included in the price.
Shipping costs are not included in the price.
Description
Hoist Imer AP 150 for scaffolding
The hoist AP 150 was designed specifically for scaffolding assembly. The drive itself is attached to the first floor of the scaffolding. Equipped with a swivel block, the extremely lightweight frame is carried and mounted on the subsequent, overhanging scaffolding floors. Please note that in the case of attachment of the drive at the very bottom the maximum hoisting height (without rewiring the drive) is 40m. In order to increase the lifting height, the drive should be mounted as high as possible (this will allow to pull scaffolding up to 80m). However, it should be remembered that then the winch will be controlled from above, by the frame taker. Of course, the Imer AP 150 scaffolding assembly winch, can be used at any later stage of the work, also to pull in all kinds of construction materials, with a maximum weight of 150 kg.
The hoist for scaffolding assembly Imer AP 150
Standard equipment:
✓ Motor with magnetic braking system
✓ Rotating boom with locking working position
✓ Control panel with emergency stop button on 5m neoprene cable
✓ Safety device against over-winding of the cable
✓ IP 67 16A connector
✓ Scaffolding terminals
| Technical data | AP 150 |
|---|---|
| Maximum capacity | 150 kg |
| Av. full load lifting speed | 30 m/min |
| Rope length | 81 m |
| Steel rope | Ø 4 mm |
| Motor | 230V/50Hz, 0.8 kW, 1350 rpm., 7,1 A |
| Weight | 50 kg |
| SPL in operator's position | <72 dB(A) |
| Dimensions | width 570 / length 355 / height 330 mm |
| Dimensions for transport | width 540 / length 410 / height 350 mm |
Warranty 12 months